Versatile creators achieved 50% faster Design-to-Production with Infurnia

Company
Versatile creators
LOCATION
Chennai
WORK
Design and Construction
MACHINERY
Panel saw, edgebanding and 5 head CNC
HIGHLIGHTS
Cutlist manager is now to free to focus on site coordination.
Designers can generate factory-ready production outputs.
All processes still production unified on one platform
50%
Faster design-to-production
100%
Automation of cutlists
50%
Reduction in design time

Challenges

  • Cutlists were created manually and then uploaded to an optimizer to prepare factory layouts for the panel saw station.The process was extremely time-consuming taking up to 3 days for drawers alone and 5 days for a full project after design finalization.
  • These manual cutlists were essential for generating board layouts, panel labels, and production outputs, often causing delays across the workflow.

Solution

  • Cutlists, board layouts, and other production outputs are now generated automatically after designing in Infurnia
  • Infurnia’s extensive catalog accelerated the design process the team customized catalog parameters to match their factory standards, making most designs a simple drag-and-drop task.

Earlier it used to take one week to 10 days to send a design to production, with Infurnia it takes about 4-5 days.  
-Sundar, Owner

Outcomes

  • The cutlist manager’s role evolved from spending 80% of his time creating manual cutlists to now overseeing design and managing on-site assembly.
  • Design-to-production time reduced by 50%, with designers now sending projects to the factory in one week instead of two.
Are you ready to scale your modular production?